Live Oak Waste Water Facility

FBPE investigators toured the Live Oak wastewater reclamation facility after some recent upgrades that included site development, a pre-treatment structure with mechanical “bar screen” treatment process tankage, clarifiers, filters, chemical feed, emergency generator, electrical, instrumentation, high service pump station, solids dewatering, and aerobic digestor.

Details

Pino, PE William

PE No. 32026
Case No. 2015040623

Licensee was charged with violating Section 471.033(1)(a), Florida Statutes, by violating Section 455.227(1)(t), Florida Statutes; being convicted or found guilty of, or entering a plea of nolo contendere to, a crime in any jurisdiction which directly relates to the practice of engineering

Details

Concrete Canoe

ASCE student organizations have been involved in constructing and racing concrete canoes on the local and conference level since the early 1970s. The first national competition came to fruition in the summer of 1988 after almost two years of discussion between representatives from the American Society of Civil Engineers and Master Builders Inc. The 2014…

Details

Hakken, Joshua

PE 63999 (Null & Void)
Case No. 2014049993

Prior Licensee was charged with violating Section 471.033(1)(a), Florida Statutes and Section 455.227(1)(t), Florida Statutes; failure to report in writing to the board, within 30 days after the licensee is convicted or found guilty of, or entered a plea or nolo contendere or guilty to, regardless of adjudication, a crime in any jurisdiction.

Details