Surveying Competition

The ability of an engineer to quickly and accurately analyze a site is very important whether analyzing pre-construction conditions or combating a problem during construction. Basic surveying skills are essential tools that every civil engineer should hold in their toolbox.The surveying team is first asked to pace and mark a provided distance from a provided…

Details

Steel Bridge

he steel bridge competition supplements the education of civil engineering students with a comprehensive, student-driven project experience from conception and design through fabrication, erection, and testing, culminating in a steel structure that meets client specifications and optimizes performance and economy. The competition increases awareness of real-world engineering issues such as spatial constraints, material properties, strength,…

Details

Hydraulic Pump

The purpose of this competition was to design an effective race car that would be propelled by the use of water to jump€ across a ramp achieving farthest distance possible. The water would be forced out by a pressurized gas, typically compressed air. Thus, an example of Newton’s third law of motion shall be demonstrated.The…

Details

Concrete Shuffleboard

This competition is to test universities in concrete mix design as well as a fun competition on the shuffleboard courts. One team per university participated in the competition with each team being comprised of four students. Each team brought 4 discs along with one optional additional disc as a back-up and was decorated with their…

Details

Cadavid, Rodrigo

Unlicensed
Case No. 20105003939

Respondent was charged with violating Section 471.033(1)(a), Florida Statutes; violating any provision of section 471.031, or any other provision of this chapter or rule of the board or department by offering and providing engineering services to the general public without holding a license as a Professional Engineer,

Details

South Miami Hospital Clinical Expansion

One of FBPE’s Investigators conducted a site visit of the South Miami Hospital clinical expansion project with the cooperation of project manager from Arellano Construction Co., general contractor for this project. The expansion will consist of a 96,000-square-foot addition that will provide for an expanded emergency department, and new surgery suite consisting of 20 operating rooms with support space.

Details

Live Oak Waste Water Facility

FBPE investigators toured the Live Oak wastewater reclamation facility after some recent upgrades that included site development, a pre-treatment structure with mechanical “bar screen” treatment process tankage, clarifiers, filters, chemical feed, emergency generator, electrical, instrumentation, high service pump station, solids dewatering, and aerobic digestor.

Details